Vermont Surveyors

Bryan Enfinger

Active Member
We've had the T2/LS since development days. We also have stand alone T2 for static. Great package, top of the line equipment. Can't stress enough, minimum on station time for static in high multi-path areas should be 1 HOUR (or more) . Have gotten great results when verified with RTK and standard terrestrial traverse
 
Top