K Davis
Member
The other day I went back to a project I started a month ago to do some additional work at the request of the client. I set the base on the control point I originally established (base point 990) which was in the design point list because I had deleted the job in the LS thinking I was finished back in May. I took some road shots and other shots I needed to calculate where to set 2 monuments. Later in the day I went back and set those monuments, so I had 2 base points (991 and 992) for the additional work.
While finishing the plat this morning I noticed that base points 991 and 992 did not constrain to the original base point 990. The CORS solution for base 991 is 8 inches east of 990 and was not moved back over to 990. The CORS solution for 991 was about a tenth west of 990 and was also not moved back to 990.
I've checked my other recent jobs and this did not happen on any of them.
I haven't changed any settings that I'm aware, but I am wondering how this happened?
The coordinate on the screenshot of the LS is 990.
While finishing the plat this morning I noticed that base points 991 and 992 did not constrain to the original base point 990. The CORS solution for base 991 is 8 inches east of 990 and was not moved back over to 990. The CORS solution for 991 was about a tenth west of 990 and was also not moved back to 990.
I've checked my other recent jobs and this did not happen on any of them.
I haven't changed any settings that I'm aware, but I am wondering how this happened?
The coordinate on the screenshot of the LS is 990.