Robert P Stenerson
Active Member
Greetings,
Today, after a 5-1/2 hour session, I reconnected up and tapped {Stop Base and Download} and everything went well for a minute or so. Then my T2 base started steady flashing with 5 red lights, and I noticed on my LS that there was about 42s left in the download. I left the LS and T2 on and took them back to the office. Back at the office I noticed that nothing had changed so I turned the T2 off. I contacted Matthew Sibole and first cleared the VRAM and tried downloading the base file, 501Base_2_110656 but it didn't go well. So he cleared out some old Base files on my T2 (I never cleared VRAM or any base files before and we've had the T2 since last April) and then he use the Base Rover Setup to download the Basefile back a couple of times, but it doesn't appear in the points list, and I have three points that I need the Hybrid RTK processing done on them as well. We checked and the previous Base file, and the one from today's session, 501Base_2_110656 as well as the three PPK points shots today are in the VSData\Maps\04-009-025.0-006.00\RawData folder, but some database needs to be updated to tell J-Field that it there and to connect the three points to it for a DPOS.
Can anybody help me still salvage the PPK processing for the three points? This was my second occupation so the I don't care about the base point per say, but I still want the three PPK points processed from it.
When I try to send the the Project archive it is too big to upload to this thread, so I putting it up on my Public Dropbox, which can be downloaded from the following link:
https://dl.dropboxusercontent.com/u/104933128/04-009-025.0-006.00-161213.zip
I'm also going to leave my LS 00547 connected to Remote Assistance.
Thank you in advance, and especially Matthew Sibole, one the Magnificent Seven, for trying his best with me today.
Rory
Today, after a 5-1/2 hour session, I reconnected up and tapped {Stop Base and Download} and everything went well for a minute or so. Then my T2 base started steady flashing with 5 red lights, and I noticed on my LS that there was about 42s left in the download. I left the LS and T2 on and took them back to the office. Back at the office I noticed that nothing had changed so I turned the T2 off. I contacted Matthew Sibole and first cleared the VRAM and tried downloading the base file, 501Base_2_110656 but it didn't go well. So he cleared out some old Base files on my T2 (I never cleared VRAM or any base files before and we've had the T2 since last April) and then he use the Base Rover Setup to download the Basefile back a couple of times, but it doesn't appear in the points list, and I have three points that I need the Hybrid RTK processing done on them as well. We checked and the previous Base file, and the one from today's session, 501Base_2_110656 as well as the three PPK points shots today are in the VSData\Maps\04-009-025.0-006.00\RawData folder, but some database needs to be updated to tell J-Field that it there and to connect the three points to it for a DPOS.
Can anybody help me still salvage the PPK processing for the three points? This was my second occupation so the I don't care about the base point per say, but I still want the three PPK points processed from it.
When I try to send the the Project archive it is too big to upload to this thread, so I putting it up on my Public Dropbox, which can be downloaded from the following link:
https://dl.dropboxusercontent.com/u/104933128/04-009-025.0-006.00-161213.zip
I'm also going to leave my LS 00547 connected to Remote Assistance.
Thank you in advance, and especially Matthew Sibole, one the Magnificent Seven, for trying his best with me today.
Rory