James Suttles
Active Member
I am looking at project, that requires the following:
Global Positioning System (GPS) equipment shall undergo a zero baseline test. A zero baseline test is a test on two or more receivers simultaneously gathering data from one antenna. The data shall be post-processed to give a resulting vector between the receivers that is equal to zero.
I spoke with Adam, and he had mentioned that Matt has been working on this or something similar. Can our Equipment meet this requirement. If so, what Antenna and resulting cable should I look at pricing into the proposal? This test will have to be done every month for the entire duration of the project, which will be around 21 months> A log of this test and the Total Station calibrations will be kept and submitted upon request. The total station hast to be calibrated once a month on an approved, by the owner, EDM Baseline and an Approved third party vendor has to be included in the adjustment of the Total Station, to check all level vials, horizontal and vertical circles, etc.
So you can see the specs are gonna be tight, and I need to know how best to perform the Zero Test Baseline with our equipment.
Thx
Global Positioning System (GPS) equipment shall undergo a zero baseline test. A zero baseline test is a test on two or more receivers simultaneously gathering data from one antenna. The data shall be post-processed to give a resulting vector between the receivers that is equal to zero.
I spoke with Adam, and he had mentioned that Matt has been working on this or something similar. Can our Equipment meet this requirement. If so, what Antenna and resulting cable should I look at pricing into the proposal? This test will have to be done every month for the entire duration of the project, which will be around 21 months> A log of this test and the Total Station calibrations will be kept and submitted upon request. The total station hast to be calibrated once a month on an approved, by the owner, EDM Baseline and an Approved third party vendor has to be included in the adjustment of the Total Station, to check all level vials, horizontal and vertical circles, etc.
So you can see the specs are gonna be tight, and I need to know how best to perform the Zero Test Baseline with our equipment.
Thx