How to batch edit to re-sequence some points

Nate The Surveyor

Well-Known Member
I want to re sequence todays work. Instead of starting with 1203, I want to start with 1403.
Batch Edit does not seem to have the ability to add 200 to the point numbers? or does it?
Thanks
Nate
 
Top