Lane Runyan
New Member
Shot points for a topo survey today that required changing between two seperate jobs. Used the same T2 for both jobs. I was able to download base data and DPOS on the job that I set the base up on initially. Both jobs have been ongoing for several months, so when I do an overlap synchronization I get all base points from any other job that has occured in the time frame trying to download. How can I DPOS points from the second job using the initial base data, so that I do not have to download all of that unnecessary base data from other setups when doing overlap sync?