Felix Wolter
Member
Hello fellow Javad users,
working in the same project since several weeks I have a general question concerning the advisible size of a project on a LS. Currently my measurement project has about 3000 polylines and around 50.000 points at 257mb and my topo project ~50 trajectories at ~70mb. I can see that the LS is taking a while to load the project, so I was wondering at what time I shuld consider starting a new project instead of adding new points to the existing ones? It is very useful for me to have all data present and searchable, but maybe you could share your opinions and experiences on what size of a project the LS starts to really struggle?
Daily backups of both, the data and the complete project are of course already at place.
Thanks a lot and with best greetings from Jordan,
Felix
/ Also the CPU of was reaching slightly above 80°C and the batteries were 40°-50C several times. Is this something to worry about or no problem at all?
working in the same project since several weeks I have a general question concerning the advisible size of a project on a LS. Currently my measurement project has about 3000 polylines and around 50.000 points at 257mb and my topo project ~50 trajectories at ~70mb. I can see that the LS is taking a while to load the project, so I was wondering at what time I shuld consider starting a new project instead of adding new points to the existing ones? It is very useful for me to have all data present and searchable, but maybe you could share your opinions and experiences on what size of a project the LS starts to really struggle?
Daily backups of both, the data and the complete project are of course already at place.
Thanks a lot and with best greetings from Jordan,
Felix
/ Also the CPU of was reaching slightly above 80°C and the batteries were 40°-50C several times. Is this something to worry about or no problem at all?