DPOS Field File along with Design Points

John Troelstrup

Active Member
I am sure this is an elementary question but one does not know what they do not know.
When I am field collecting with an autonomous base location, I will calculate search for points while doing Boundary recovery.
These of course become Design points.
When I DPOS, the design points do not update with the appropriate shift.

Am I missing a toggle or step in order to get the field calc positions to update along with my Surveyed points when I DPOS?

Thank you in advance,
 
Top