Civilsurvey
New Member
I normally DPOS my job when I only have 1 base setup. I now have 3 base sessions and I want to DPOS the job to get an accurate Elevation and coords.
I did download the base from the first session, so that one is ready to DPOS. I used to have a cheat sheet that told me what buttons to click to make all three base sessions meld into one.
Could someone please walk me through the steps to have all three base sessions DPOS'ed correctly?
I did download the base from the first session, so that one is ready to DPOS. I used to have a cheat sheet that told me what buttons to click to make all three base sessions meld into one.
Could someone please walk me through the steps to have all three base sessions DPOS'ed correctly?