I use the "Accept As" button alot. Such as staking a line, for 1/4 mile through the woods, and client wants stakes every 100 feet or so.
When I press "Accept As" it does not retain a memory of the point desc. It should remember the LAST description. And, there is room, across the top of the screen for the last 4 point descriptions in boxes.
The job I was working on, needed 3/8" rebar set all along it. In addition to a up-tight client, I also had a nervous neighbor, and typing in "Set 3/8" rebar" as point description.
So, it'd be good to have it repeat the last, and have the 4 buttons across the top of screen, (Last 4 Pt Desc) to select from. It would speed and relax field procedure. It'd just make it "Better".
Thanks!
Nate
When I press "Accept As" it does not retain a memory of the point desc. It should remember the LAST description. And, there is room, across the top of the screen for the last 4 point descriptions in boxes.
The job I was working on, needed 3/8" rebar set all along it. In addition to a up-tight client, I also had a nervous neighbor, and typing in "Set 3/8" rebar" as point description.
So, it'd be good to have it repeat the last, and have the 4 buttons across the top of screen, (Last 4 Pt Desc) to select from. It would speed and relax field procedure. It'd just make it "Better".
Thanks!
Nate