Nate The Surveyor
Well-Known Member
I am a field cogo guy. I like cogo in the field. While data collecting.
I draw a sketch as I go, or write point numbers on a USGS, with deed lines drawn on it.
So, a work flow might go like this:
Go to Section corner, stay there for 10 mins, shoot it 5x, and Average the points. So, point 42_AVG gets written on the field cheet sheet.
Then, go to next corner. Same deal. Next corner, same deal. Now, I tell the LS to average the clusters.
We wind up with 3 clusters.
Next, we (using these average cluster points) calc a few more, and using stake, we metal detect, and go to them. Shoot them. More clusters.
With a work flow like this, It'd be nice to be able to use another name for the average point name. Like just the point number av. With it being case sensitive, it wants me to key it in just right, for further cogo. And, when I get home, I have used the Average Clusters 3 times, in the field. So, (because it continues to USE the averaged point clusters, to Re average the clusters already made, I have to delete all the _AVG points, and then re-make the _AVG points, (So that there is only one AVERAGE point for that shot.)
If there was a little set up screen, to set the nomenclature for averaged points.
And, Cluster would have the option to SKIP previous clusters, OR it could re-average previous clusters, (for those return visits, where we shoot a point multiple times, with a time separation. But, it it can update the previous avg point.
IF you return to a prev cluster, and shoot it, then it could UPDATE the cluster average point, it would save steps.
Using the cluster Averaging, we are winding up with Total Station Accuracy, in the woods.....
So, I'm trying to add direction, with ideas, for the Cluster AVG program.
I will also say, that I am often getting 2 days of work done in a day, compared to my old GPS system.
N
I draw a sketch as I go, or write point numbers on a USGS, with deed lines drawn on it.
So, a work flow might go like this:
Go to Section corner, stay there for 10 mins, shoot it 5x, and Average the points. So, point 42_AVG gets written on the field cheet sheet.
Then, go to next corner. Same deal. Next corner, same deal. Now, I tell the LS to average the clusters.
We wind up with 3 clusters.
Next, we (using these average cluster points) calc a few more, and using stake, we metal detect, and go to them. Shoot them. More clusters.
With a work flow like this, It'd be nice to be able to use another name for the average point name. Like just the point number av. With it being case sensitive, it wants me to key it in just right, for further cogo. And, when I get home, I have used the Average Clusters 3 times, in the field. So, (because it continues to USE the averaged point clusters, to Re average the clusters already made, I have to delete all the _AVG points, and then re-make the _AVG points, (So that there is only one AVERAGE point for that shot.)
If there was a little set up screen, to set the nomenclature for averaged points.
And, Cluster would have the option to SKIP previous clusters, OR it could re-average previous clusters, (for those return visits, where we shoot a point multiple times, with a time separation. But, it it can update the previous avg point.
IF you return to a prev cluster, and shoot it, then it could UPDATE the cluster average point, it would save steps.
Using the cluster Averaging, we are winding up with Total Station Accuracy, in the woods.....
So, I'm trying to add direction, with ideas, for the Cluster AVG program.
I will also say, that I am often getting 2 days of work done in a day, compared to my old GPS system.
N