Bruce Dawson
Active Member
Hi everyone,
I just did a two day topo job where I could not DPOS the points until today. I have two base files (one for each day) but I only downloaded the first day, which is the one I ran through DPOS. Is there a way to shift or move the second day's work onto the corrected positions? I can do it in CAD, but can I do it in JField?
Thanks!
Bruce
I just did a two day topo job where I could not DPOS the points until today. I have two base files (one for each day) but I only downloaded the first day, which is the one I ran through DPOS. Is there a way to shift or move the second day's work onto the corrected positions? I can do it in CAD, but can I do it in JField?
Thanks!
Bruce