Mark Wheeler
Active Member
Today is July 8th. Could the July 3rd solar flare still be inhibitting the LS+'s ability to lock fixes? This morning I spent 4 hours on a site with PDOP between 1.3 and 1.4. 4 Constellation satellyte availability varied, but was generally very good. At times excellent. For topo I had confidence set on 6 and then backed it down to 3 or 4 to speed things up. Most of the work was in the open and at times I would wait 5 minutes with all 4 engines floating. For the majority of the time I would only get 1 fixed engine (usually engine 1). This varied throughout the morning, but definitely not good results. Last Friday I updated to the latest softwware. This issue could be related to the update or it might be the fallout from the Solar Flare. Has anyone else had any issues this past week?