Jim Campi
Active Member
Gentlemen,
Yesterday I completed a 4 hour RTK survey with the T2 set up on an autonomous position. The recording interval on the T2 was 30 seconds.
At the end the day, my tech disassembled the base and left the T2 on for approximately 5 minutes. The unit was moved about 200 yards over the course of the 5 minute interval.
My intention was to send the base file to DPOS for corrections and update the LS coordinates. What impact, if any, will moving the T2 have on the base file and is there anything I can do if this is a problem? Can I delete the last 5 minutes of data points?
Yesterday I completed a 4 hour RTK survey with the T2 set up on an autonomous position. The recording interval on the T2 was 30 seconds.
At the end the day, my tech disassembled the base and left the T2 on for approximately 5 minutes. The unit was moved about 200 yards over the course of the 5 minute interval.
My intention was to send the base file to DPOS for corrections and update the LS coordinates. What impact, if any, will moving the T2 have on the base file and is there anything I can do if this is a problem? Can I delete the last 5 minutes of data points?