Duane Frymire
Active Member
Recently purchased T 1M locking up and radio not transmitting well, SN 25396.
Using T 1M base and LS rover. Day 1 Base started using Known point, and records data. Same project Day 2 base started using known point, Base locked up and shut down, no base file seems to be present for the day 2 session. DPOS the project and day 1 base and points process normally, However, day 2 RTK points exist that were shot during that session and PPK points exist that are consistent 3.5 ft. north and 1.5 ft. east of RTK. PPK says "unkown" instead of "bcp".
I'm assuming the day 2 rtk shots are good, but the associated ppk shots make it look like something is wrong.
Wondering what the PPK "unkown" represents? And, is there any way to associate a block of points from day 2 with the base session from day 1?
Using T 1M base and LS rover. Day 1 Base started using Known point, and records data. Same project Day 2 base started using known point, Base locked up and shut down, no base file seems to be present for the day 2 session. DPOS the project and day 1 base and points process normally, However, day 2 RTK points exist that were shot during that session and PPK points exist that are consistent 3.5 ft. north and 1.5 ft. east of RTK. PPK says "unkown" instead of "bcp".
I'm assuming the day 2 rtk shots are good, but the associated ppk shots make it look like something is wrong.
Wondering what the PPK "unkown" represents? And, is there any way to associate a block of points from day 2 with the base session from day 1?