I work in the PLSS. Here, we often will tie into a dozen or more monuments. Then, make MID points. Maybe 5, 10, or more times in a day. As we subdivide, and RE subdivide a section. That is, we have an ongoing need to make mid points in the field. Sometimes we over write an existing mid pnt.
Now, if we could just have a simple button, on the inverse screen, That, by pressing it, makes a MID point, between the points showing in the inverse.
The elevation, would be the average of the two end points, unless one was a design point, and then it would be the same as the one that was not a design point. And, if it was a mid between design points, that have 0 elev, then it would have a 0 elev likewise.
That would be awesome!
And, since we already have 2 points on the screen, press ANOTHER button, and it takes you straight to the STAKE LINE by 2 POINTS.
These 2 things, would make it better for us in the woods.
Thank you! Hope you over in Russia, had a very Merry Christmas!
Nate
Now, if we could just have a simple button, on the inverse screen, That, by pressing it, makes a MID point, between the points showing in the inverse.
The elevation, would be the average of the two end points, unless one was a design point, and then it would be the same as the one that was not a design point. And, if it was a mid between design points, that have 0 elev, then it would have a 0 elev likewise.
That would be awesome!
And, since we already have 2 points on the screen, press ANOTHER button, and it takes you straight to the STAKE LINE by 2 POINTS.
These 2 things, would make it better for us in the woods.
Thank you! Hope you over in Russia, had a very Merry Christmas!
Nate